| 1. | In - situ bridge deck construction across the nullah 横跨大沟渠的桥面兴建工程 |
| 2. | In - situ bridge deck construction across the 横跨大沟渠的高架桥兴建工程 |
| 3. | Installation of traveling form for deck construction at grid 4 为建造桥面于四号台安装活动式套架 |
| 4. | Fire test of roof deck construction 屋顶覆盖层结构的着火试验 |
| 5. | Fire test of roof deck constructions 屋顶板结构的防火试验 |
| 6. | Erection of falsework for in - situ bridge deck construction at viaduct b1 兴建中的隔音屏地基兴建中的高架桥横梁 |
| 7. | Pylon above deck construction C2桥-临时支架工程 |
| 8. | Erected temporary portal over slip road to from tuen mun road for bridge - deck construction 为桥面工程设置临时铁架于屯门公路入口 |
| 9. | B 160m of dual 2 - lane approach ramp of piled in - situ deck construction for connecting to existing roads in the lok ma chau control point ; 120m of two - lane overbridge for passenger vehicles 兴建一条160米长,现场基桩桥面施工的双程双线分隔接驳斜道,以连接高架引道至落马洲控制站的现有路面 |
| 10. | In the segment precasting , cantilever erection and bridge deck construction during the paksey bridge construction , the precise surveying control results in the minimum error between the bridge deck line and the designed line 摘要在paksey大桥的施工过程中,对节段梁的预制、节段梁的悬臂拼装以及桥面体系的施工进行了精密的测量控制,从而使桥面线形与设计线形的误差最小。 |